A periodic time frame can be used to arrange for Control Limit and Center Line calculations with
good SPC implementation in a process.
A
The data on SPC charts are typically constructed such that they have the most recent data point on
the right hand side.
A
Which statement(s) describe an undesirable situation when implementing SPC?
D
If a process has Outliers which pair of charts is most preferable if subgroups will exist for the
Continuous Data?
B
After a Belt has put data through the smoothing process which chart would be used to look for trends
in the data?
A
A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the
Control Plan be closed?
A
When analyzing a data set we frequently graph one metric as a function of another. If the slope of
the Correlation line is -2.5 we would say the two metrics are ___________ correlated?
C
Multiple Linear Regressions (MLR) is best used when which of these are applicable? (Note: There are
3 correct answers).
C,D,E
Fractional Factorial designs for an experimental approach are used when ____________ about the
multiple metric interaction in a process.
B
A Belt will occasionally do a quick experiment referred to as an OFAT which stands for
____________________.
C