Question 1

A periodic time frame can be used to arrange for Control Limit and Center Line calculations with
good SPC implementation in a process.

  • A. True
  • B. False
Answer:

A

vote your answer:
A
B
A 0 B 0
Comments
Question 2

The data on SPC charts are typically constructed such that they have the most recent data point on
the right hand side.

  • A. True
  • B. False
Answer:

A

vote your answer:
A
B
A 0 B 0
Comments
Question 3

Which statement(s) describe an undesirable situation when implementing SPC?

  • A. The lower Control Limit for the R chart is equal to zero
  • B. Attempt to use SPC for tracking transaction times at a warehouse
  • C. A process is in Statistical Control before implementation of SPC
  • D. The Control Limits are wider than the customer specification limits
Answer:

D

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 4

If a process has Outliers which pair of charts is most preferable if subgroups will exist for the
Continuous Data?

  • A. Individual—Moving Range
  • B. Xbar-R Charts
  • C. Xbar-S Charts
  • D. nP and P Charts
Answer:

B

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 5

After a Belt has put data through the smoothing process which chart would be used to look for trends
in the data?

  • A. Moving Average Chart
  • B. Multi-Vari Chart
  • C. X bar Chart
  • D. Pareto Chart
Answer:

A

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 6

A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the
Control Plan be closed?

  • A. Never, a Control Plan is a living document
  • B. As soon as the Champion signs off
  • C. Within 30 days of the LSS project review team meeting
  • D. After the project has been presented at the recognition event
Answer:

A

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 7

When analyzing a data set we frequently graph one metric as a function of another. If the slope of
the Correlation line is -2.5 we would say the two metrics are ___________ correlated?

  • A. Positively
  • B. Not
  • C. Negatively
  • D. None
Answer:

C

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 8

Multiple Linear Regressions (MLR) is best used when which of these are applicable? (Note: There are
3 correct answers).

  • A. Non-linear relationships between the inputs X’s and output Y
  • B. Uncertainty in the slope of the linear relationship between an X and a Y
  • C. Relationships between Y (output) and more than one X (Input)
  • D. Preventing the use of a Designed Experiment if unnecessary
  • E. We assume that the X’s are independent of each other
Answer:

C, D, E

vote your answer:
A
B
C
D
E
A 0 B 0 C 0 D 0 E 0
Comments
Question 9

Fractional Factorial designs for an experimental approach are used when ____________ about the
multiple metric interaction in a process.

  • A. Much is known
  • B. Little is known
  • C. We don’t care
  • D. Data exists
Answer:

B

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 10

A Belt will occasionally do a quick experiment referred to as an OFAT which stands for
____________________.

  • A. Only a Few Are Tested
  • B. Opposite Factors Affect Technique
  • C. One Factor At a Time
  • D. Ordinary Fractional Approach Technique
Answer:

C

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Page 1 out of 19
Viewing questions 1-10 out of 200
Go To