SAP e-s4con-2505 practice test

Exam Title: SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade

Last update: Nov 27 ,2025
Question 1

You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed
during the preparation phase?

  • A. Perform the migration of data to the new data structure.
  • B. Run the database migration to the SAP HANA database.
  • C. Check the compatibility of custom code with SAP S/4HANA.
  • D. Solve problems from the simplification item (SI) checks.
Answer:

C

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 2

You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the
beginning of the technical downtime, irrespective of your SUM configuration? Note: There are 3
correct answe rs to this question.

  • A. Activation of dictionary objects in phase ACT_UPG
  • B. Import of upgrade and language data from the download directory in phase TABIM_UPG
  • C. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • D. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
  • E. Import of dictionary objects from the download directory in phase DDIC_UPG
Answer:

A D E

vote your answer:
A
B
C
D
E
A 0 B 0 C 0 D 0 E 0
Comments
Question 3

During a SUM run, you want to check if the PARCONV_UPG phase is still running properly. Where can
you find information about this? Note: There are 2 correct answe rs to this question.

  • A. Check the running batch job via Job Overview (SM37).
  • B. Check for running R3trans processes on the host where SUM is running.
  • C. Check for running R3load processes on the host where SUM is running.
  • D. Check the latest log files in the SUM directory, subdirectory abap, subdirectory tmp.
Answer:

A D

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 4

During the upgrade of your development system, you run into the adjustment of non-dictionary
objects, handled by transaction SPAU. There you find programs that are shown in status "automatic
adjustment" (green traffic light). What will happen with these programs when you continue with
your upgrade without performing any other actions inside your SAP system?

  • A. SUM continues with the next phase and your modifications are kept as in the start release.
  • B. SUM refuses to continue unless you have marked a transport request as modification adjustment transport.
  • C. SUM continues with the next phase, and your modified objects are set to the new SAP standard.
  • D. Before continuing with the next phase, SUM asks for a modification adjustment transport.
Answer:

A

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 5

What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private
Edition?

  • A. Migration Server
  • B. Migration Hub
  • C. Transition Server
  • D. Central Instance
Answer:

A

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 6

How does SUM recognize modification adjustment transports from predecessor systems?

  • A. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • B. By searching for transport requests that are assigned to project SAP_ADJUST
  • C. By searching for transport requests named <sid>K0<number>
  • D. By searching for transport requests in file umodauto.lst
Answer:

D

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 7

You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in
time when you can reset the procedure without losing data?

  • A. The end of the database migration
  • B. The start of the Execution roadmap step
  • C. The end of the business downtime
  • D. The start of the business downtime
Answer:

D

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 8

What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2
correct answe rs to this question.

  • A. You can find the optimal number of parallel R3load processes by monitoring host performance.
  • B. You can record the modification adjustment during migration and use the transports in the next runs.
  • C. You can verify that the content of the download directory matches the stack.XML file.
  • D. You can obtain migration duration files from a previous benchmark run that can be used to optimize the next runs.
Answer:

A D

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 9

What is the benefit of using the UPGANA.XML file from a previous SUM run?

  • A. To make the progress information within SUM UI more accurate
  • B. To skip selected phases during the SUM run
  • C. To repeat specific phases during the SUM run
  • D. To auto-fill specific fields on selected screens on the SUM UI
Answer:

A

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 10

Which of the following SUM activities require a stack XML file calculated by the maintenance
planner? Note: There are 3 correct answe rs to this question.

  • A. DMO without system update
  • B. SAP S/4HANA conversion without DMO
  • C. Prerequisite check
  • D. Benchmark tool
  • E. SAP S/4HANA conversion including DMO
Answer:

B C E

vote your answer:
A
B
C
D
E
A 0 B 0 C 0 D 0 E 0
Comments