SAP c-ibp-2502 practice test

Exam Title: SAP Certified Associate - SAP IBP for Supply Chain

Last update: Nov 27 ,2025
Question 1

Which options can be used to reduce the runtimes of a time-series optimizer run? Note: There are 3
correct answers to this question.

  • A. Keep the number of fairshare segments small
  • B. Split into multiple planning areas to support weekly vs. daily planning needs.
  • C. Use non-overlapping networks by using Subnetworks ID maintained at Location-Products to reduce the size of the problem
  • D. Eliminate the usage of telescopic time buckets
  • E. Increase the use of incremental lot size beyond the frozen horizon.
Answer:

A, C, D

vote your answer:
A
B
C
D
E
A 0 B 0 C 0 D 0 E 0
Comments
Question 2

What is an example of a commonly used time-independent key figure?

  • A. A Special key figure marked as an aggregate key figure (aggregate constraint)
  • B. A unit of measure key figure, such as UoM Conversion Factor
  • C. Any attribute as a key figure
  • D. A currency conversion key figure, such as Exchange Rate
Answer:

C

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 3

What is an example of a commonly used time-independent key figure?

  • A. A Special key figure marked as an aggregate key figure (aggregate constraint)
  • B. A unit of measure key figure, such as UoM Conversion Factor
  • C. Any attribute as a key figure
  • D. A currency conversion key figure, such as Exchange Rate
Answer:

B, C

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 4

You are starting a new implementation project for SAP IBP and are considering the possible system
architecture. What are the possible approaches for setting up the system landscape? Note: There are
2correct answers to this question

  • A. Setup the two-tier landscape and have the configuration for development system regularly — updated from the production system
  • B. Create additional planning areas in the test system to support training needs.
  • C. Create additional test planning areas in the production system to support cutover needs
  • D. Set up a three-tier landscape using transport, starting from the development system to test and — production
Answer:

B, D

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 5

What are some of the capabilities of the Planner Workspaces app? Note: There are 2 correct answers
to this question.

  • A. It supports simulating the effect of the changes
  • B. It supports favourites created in SAP IBP, add-in for Microsoft Excel
  • C. It supports embedding analytic stories as a workspace component
  • D. It supports sharing with other users or user groups.
Answer:

B, C

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 6

Which of the following conditions are relevant for subtotals in the planning view?Note: There are 2
correct answers to this question.

  • A. The total value can be added before or after the selected attribute
  • B. The Total number of the attribute that can use subtotal in the planning view can be restricted
  • C. The values of the attribute-based total at the highest attribute level in the planning level can be — changed
  • D. Only attribute-based totals can be added to the planning view.
Answer:

A, B

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 7

Manage Analytics Stories introduces advanced visualization features within SAP Integrated Business
Planning for Supply Chain. What are some of the main capabilities of the stories? Note: There are 3
correct answers to this question.

  • A. Links to the external URLs can be embedded in the story.
  • B. The story is structured around one responsive page
  • C. Specific chart and table filters can be applied within the story
  • D. Stories must be re-created in each SAP IBP environment.
Answer:

A, C, D

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 8

What option is available for the key figure that is enabled for fixing?

  • A. Fixing is possible for key figures with negative values
  • B. Fixing is possible for a part of key figure value on a certain planning level
  • C. You can change a fixed key figure only with administrative rights
  • D. Fixing is possible for certain period, Including all child values in the hierarchy
Answer:

D

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 9

You are adding a value-based filter to a planning view. Which of the following conditions apply?
Note: Thereare 2 correct answers to this question.

  • A. These filters can be used together with attributes totals in the same planning view
  • B. The alerts dashboard is not available if a value-based filter is set for the open planning view
  • C. You can add (or delete) planning objects to a planning view after these filters are applied
  • D. You can only apply one value-based filter per planning view.
Answer:

A, C

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 10

You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP. What are the integration
toolsthat you can use with such a setup for data transfer? Note: There are 2 correct answers to this
question.

  • A. SAP Cloud Integration for data services
  • B. SAP Smart data Integration
  • C. Core Interface
  • D. Real-time Integration
Answer:

A, B

vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Page 1 out of 7
Viewing questions 1-10 out of 80
Go To
page 2