You are configuring the period templates that are used for inventory inquiries. Todays date is November 3, 2020.
The period templates configuration is shown in the following graphic. You set the value for the Direction field to backward.
Use the drop-down menus to select the answer choice that answers each question based on the information presented in
the graphic.
NOTE: Each correct selection is worth one point.
Hot Area:
HOTSPOT
A company that has three legal entities is implementing Dynamics 365 Supply Chain Management.
One legal entity supplies the other two legal entities as customers with inventory. Intercompany master planning must be set
up and run in the least amount of time.
You need to configure the system to meet the requirements.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:
Explanation:
Reference: http://d365tour.com/en/microsoft-dynamics-d365o/master-planning-d365fo/intercompany-masterplanning/
Implement master planning
HOTSPOT
A company implements Dynamics 365 Supply Chain Management.
You complete the prerequisites to implement the master planning optimization.
You need to configure the planning optimization feature.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:
Explanation:
Reference: https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/planningoptimization/get-started
DRAG DROP
A manufacturing company uses Dynamics 365 Supply Chain Management.
You must update the safety stock level for raw materials.
You need to calculate and process minimum coverage proposals based on data from historical transactions.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the
answer area and arrange them in the correct order.
Select and Place:
Explanation:
Reference: https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/tasks/use-safetystock-journal-
update-minimum-coverage
DRAG DROP
A company uses Dynamics 365 Supply Chain Management with master planning.
The company needs to enable planning optimization functionality to improve master planning processes.
You need to advise which prerequisites the company must fulfill to enable planning optimization.
What must the company do? To answer, drag the appropriate types to the correct prerequisites. Each type may be used
once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:
Explanation:
Reference: https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/planningoptimization/get-started
DRAG DROP
A company is implementing Dynamics 365 Supply Chain Management.
You need to determine which planning engine meets each business requirement.
Which planning engine should you use for each requirement? To answer, drag the appropriate planning engines to the
correct requirements. Each planning engine may be used once, more than once, or not at all. You may need to drag the split
bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:
Explanation:
Reference:
https://docs.microsoft.com/en-us/learn/modules/planning-optimization/10-auto-firming
https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/planning-optimization/planning-optimization-
overview
Implement master planning
DRAG DROP
A company implements Dynamics 365 Supply Chain Management.
The company needs to improve the reliability of their forecasting data.
You need to implement demand forecasting to meet the requirements.
What should you do? To answer, drag the appropriate actions to the correct requirements. Each action may be used once,
more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/introduction-demand-forecasting
https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/manual-adjustments-baseline-forecast
A company uses planning optimization in Dynamics 365 Supply Chain Management.
A planning optimization job is triggered by mistake from the user interface. The planning optimization job is running with
incorrect runtime filters.
You need to resolve the issue.
What should you do?
A
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/planning-optimization/cancel-planning-job
A company uses Dynamics 365 Supply Chain Management.
The company is consistently short on inventory for a group of produced finished good items. This creates customer service
issues.
You need to ensure that production orders are automatically created when inventory is low.
Which two actions should you perform? Each answer represents a partial solution.
NOTE: Each correct selection is worth one point.
B D
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/tasks/use-safety-stock-journal-update-
minimum-coverage
A company uses planning optimization in Dynamics 365 Supply Chain Management. Automatic firming is enabled.
Some of the planned purchase orders are not being firmed as expected. The inventory planners therefore need to manually
process planned purchase orders.
You need to include the planned purchase orders in automatic firming.
What are two possible configurations you can use? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
A B
Explanation:
Reference: https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/planning-optimization/planning-
optimization-auto-firming
HOTSPOT
A company uses Dynamics 365 Supply Chain Management to sell consumer electronics to retailers across North America.
An inventory manager needs to view purchase orders by different periods of time for all warehouses.
If there are insufficient orders for expected demand, the manager must create new purchase or transfer orders to meet the
demand versus the current on-hand inventory that is already allocated for future demand.
The company also needs to keep a surplus of 5 percent of inventory for unexpected demand.
You need to identify a solution to meet these requirements.
Which feature should you use for each requirement? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:
Explanation:
Reference:
https://community.dynamics.com/ax/f/microsoft-dynamics-ax-forum/147370/supply-schedule-form/497235
A company operates a chain of retail coffee shops and a distribution center. Each coffee shop and the distribution center are
distinct warehouses.
Cups and lids are replenished from a single distribution center.
You need to configure store replenishment for coffee cup lids.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
A B D
DRAG DROP
A manufacturing company is setting up a new warehouse.
The warehouse must store a product that is currently stored in another warehouse.
You need to create new item coverage for the warehouse.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the
answer area and arrange them in the correct order.
Select and Place:
SIMULATION
You are a functional consultant for a company named Contoso Entertainment System USA (USMF).
You need to regenerate a master plan named DynPlan for item number D0023.
To complete this task, sign in to Dynamics 365 portal.
See explanation below.
Explanation:
You specify the planning method in the Master planning run dialog box. To open this dialog box, go to Master planning >
Master planning > Run > Master planning, or select Run in the Master planning workspace.
Regeneration
The regeneration planning method deletes existing planned orders, unless they are firmed. It generates new planned orders,
based on all the requirements. Regeneration is the only planning method that is available for static plans.
Changes in supply are considered. These changes include changes in the forecast.
This method respects the Period coverage code.
This method supports product substitution functionality (PI).
Select DynPlan in the Master Plan field.
Select Regeneration in the Planning Method field. Enter D0023 in the Item Number field.
You are the planner for a distribution company.
You observe an increase in planned orders for item C0001. You must track the source for these planned orders and break
them out based on their demand. You are not concerned with safety stock maximums for this item.
You need to ensure that the master planning batch job will create a unique planned purchase order for every new demand
requirement for C0001.
Which coverage code should you use?
D
Explanation: