avixa cts practice test

Exam Title: Certified Technology Specialist

Last update: Nov 27 ,2025
Question 1

[Developing AV Solutions]
Network Quality of Service (QoS) is defined as

  • A. the ability to prioritize the traffic in the network system.
  • B. the ability to set the quantity of stations connected via the network.
  • C. the ability to remotely manage network switches, routers and hubs via the network connection.
  • D. a feature allowing the network administrator to monitor who is connected to the network at any given time.
Answer:

A


vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 2

[Developing AV Solutions]
A saeen is 144 in (3658 mm) wide and the throw ratio is 2.3:1. How far from the screen should the
projector be placed?

  • A. 288 In (7303 mm)
  • B. 302 in (7681 mm)
  • C. 331 in (8413 mm)
  • D. 446 in (11339 mm)
Answer:

C


vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 3

[Developing AV Solutions]
Which method of control is supported by HDBaseT?

  • A. PCIE
  • B. DAU
  • C. RS-232
  • D. DMX512
Answer:

C


vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 4

[Developing AV Solutions]
During project delivery and after completion, it is important to ensure correct management of
control system code so that

  • A. programming costs will be within project budget.
  • B. other contractors are unable to reuse or edit code.
  • C. the most up-to-date version of code is available for upload when required.
  • D. sub-contract programmers submit uncompiled code as per their contract of employment.
Answer:

C


vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 5

[Developing AV Solutions]
Assuming a 10' (3 m) ceiling, what is the approximate volume of this room?

  • A. 300 cubic ft (8.5 m3)
  • B. 600 cubic ft (17 m3)
  • C. 1500 cubic ft (42.5 m3) o
  • D. 6000 cubic ft (162 m3)
Answer:

D


vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 6

[Developing AV Solutions]
The BEST way to ensure that a project is on budget is to

  • A. calculate the number of calendars days remaining to completion.
  • B. visit the job site and determine the percentage of work completed.
  • C. ask the installation team to estimate remaining work to completion.
  • D. review accrued labor and material costs against remaining work.
Answer:

D


vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 7

[Operating AV Systems]
Maintaining AV operations includes which of the following?

  • A. conforming to DISCAS
  • B. measuring system SPL
  • C. updating control system firmware
  • D. comparing NAG and PAG calculations
Answer:

C


vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 8

[Developing AV Solutions]
How frequently should a personal fall arrest harness be inspected?

  • A. weekly
  • B. before each use
  • C. at the beginning of each project
  • D. at the beginning of each work day
Answer:

B


vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 9

[Developing AV Solutions]
When discussing a proposed audiovisual project with a new customer, it is important for the
salesperson to FIRST

  • A. conduct a survey of end users to determine the project goals.
  • B. prepare a detailed layout of the equipment and cabling requirements.
  • C. identify the key decision makers and stakeholders in the client's organization.
  • D. consult with the project manager to determine the availability of staff to complete the installation.
Answer:

C


vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Question 10

[Developing AV Solutions]
Project documentation states the system must logically Isolate control and media networks. What
piece of network equipment should be used?

  • A. router
  • B. access point
  • C. managed switch
  • D. unmanaged switch
Answer:

C


vote your answer:
A
B
C
D
A 0 B 0 C 0 D 0
Comments
Page 1 out of 25
Viewing questions 1-10 out of 254
Go To
page 2